DESIGN SERVICES
Diğer Faaliyet Alanları
Deep Excavation Projects

During the deep excavation for the opening foundation pit some problems might occur such as horizontal movement, settlement which are eliminated safely by our company. Mainly foundation pits are opened at safe-stable slopes and open excavations or excavation of supported internal wall by opening vertical- near vertical slopes. 

In order to select economic and safe drilling system design parameters such as soil type and strength, location of adjacent structures, groundwater conditions, the period during  which the foundation pit will remain open, cutting slope preservation, edge and base stability, horizontal and vertical displacements that may occur n the region are investigated. A detailed examination is performed.

The retaining system according to surrounding structures’ condition and the characteristics of the ground layer are selected during deep excavation. This retaining can be concrete, timber or steel curtains of sheet piling, diaphragm walls, cast-in-situ piles, concrete and soil nailed walls. The horizontal retaining and anchorages may be required for stabilization for this kind of restraining after crossing a certain depth.


Training (26 January 2013)
For the employee training, organized a seminar about "Write and Puplish a Scientific Paper" on 26 January 2013.
Training (19 January 2013)
For the employee training, organized a seminar about "How to use Plaxis and Plaxis examples" on 19 January 2013.
Bauer BG 24 H bored pile machine is added to our machinery park.
Bauer BG 24 H bored pile machine is added to our machinery park (2011).
2 Soilmec PSM-8G boring machines are added to our machinery park.
Soilmec PSM-8G boring machines have the feature of crawlers, automatic SPT and drilling from every angle.
Marmaray Project
We are working at Yenikapı and Üsküdar sites of Marmaray Project.
We have joined to the International Geosynthetics Society, IGS.
Our company which is active at Geosynthetics area, joined to the International Geosynthetics Society, IGS.
Casagrande B200 XP drilling rig is added to our machinery park.
Custom transactions of the Italian Casagrande B200 XP drilling rig is completed and commenced working.
2000ton capacity Pile Load Test
2000ton capacity pile load test was completed in success.
Seimic Test with CPT
We have initiated seismic measurements with CPT. We have added shear and pressure wave velocity measurement capability to continious data collection feature of CPT.
T. C. Karayollari
OHL Tuzla Infantry School Bridge
Φ 120 piles
01/04/2013
Ceylan İnsaat
Bolu Project
Φ 80 jet grout
01/04/2013
T. C. Karayolları
Erzincan Erzurum Highway
Manufacturing Φ120 piles for cut-and-cover tunnel in Mutu Bridge Erzincan Erzurum Highway
01/04/2013
University Project
Yalova Cınarcık Highway
manufacturing Φ100 pile for University entry crossing in Yalova Cınarcık Highway
01/04/2013
Canakkale-Bandırma Road Landslide Improving
Canakkale-Bandırma Road Landslide Improving
Φ 120 cm bored pile
20/11/2012
Begum Yapi Bursa
Toki Housing Development Adminstration Of Turkey School Construction in Yalova
Φ 80 cm bored pile
5/12/2012
Salini-Kolin-GCF Partnership
Ankara-Istanbul High-Speed Train Kocaeli
Soil improvement with Φ 80 cm jetgrout 1 according to TCK and relevant conditious of contract in Gebze-Kosekoy part
10/2012
HASOGLU YAPI
Newista
Subase Piles
08/2011
GAMA-NUROL
Marmaray Project Injection
Marmaray Project Uskudar-Yenikapi-Ayrilikcesme stations injection
10/2010
ZTM Main Office
Kardeskent 1 Sitesi A-1 Blok Daire 2
Beylikduzu – Istanbul / Turkey
T : +90 212 886 51 51 F : +90 212 886 77 18
ZTM - Altunizade Office
Kusbakisi Cad. Asuroglu Sitesi 3. Blok/5-6
Uskudar – Istanbul / Turkey
T : +90 216 474 88 87 F : +90 216 474 88 86
ZTM - Kazakhstan Office
Republic of Kazakhstan Almaty
Panfilova 103/A
T : +7 727 271 85 33 


Soil Technologies Center - Services