DESIGN SERVICES
Diğer Faaliyet Alanları
Comformity For The Settlement Reports

Conformity for the settlement reports are prepared by our company taking into consideration the following circumstances:

- Geologic Factors: Lithologic and engineering characteristics of the formations determined in the project area,

- Geomorphologic Factors: The valley, streamed bed (flood risk), slope structures and slope,

- Groundwater Status: Areas with shallow underground water level restrictive in terms of planning,

- Fault and Earthquake Potentials,

- Engineering geology and geotechnical parameters such as detail calculations and solutions for the load capacity of the soil, liquefaction of soil, potential of slump and expansion under the title of "Geotechnical Appreciations And Calculations".

As a result of conformity for the settlement surveillance, area of conformity for the settlement, important areas, area that require detailed geotechnical survey and areas that are not suitable for settlement are classified.

Important Areas

Due to danger of natural disasters and geotechnical properties of soil, we consider the planning prior to construction and/or during construction and also the area of the construction as highly important.

Areas Of Requiring Detailed Geotechnical Survey

Areas where the exact and reliable conclusion could not be reached because of the lack of data caused by the study method, require separate studies. Followed by detailed geotechnical studies, planning is done.

Unsuitable For Conformity Settlement

Areas where technical and economical provision cannot be made because of the danger of natural disasters and geotechnical problems. Construction in these area is not allowed. 

 


Training (26 January 2013)
For the employee training, organized a seminar about "Write and Puplish a Scientific Paper" on 26 January 2013.
Training (19 January 2013)
For the employee training, organized a seminar about "How to use Plaxis and Plaxis examples" on 19 January 2013.
Bauer BG 24 H bored pile machine is added to our machinery park.
Bauer BG 24 H bored pile machine is added to our machinery park (2011).
2 Soilmec PSM-8G boring machines are added to our machinery park.
Soilmec PSM-8G boring machines have the feature of crawlers, automatic SPT and drilling from every angle.
Marmaray Project
We are working at Yenikapı and Üsküdar sites of Marmaray Project.
We have joined to the International Geosynthetics Society, IGS.
Our company which is active at Geosynthetics area, joined to the International Geosynthetics Society, IGS.
Casagrande B200 XP drilling rig is added to our machinery park.
Custom transactions of the Italian Casagrande B200 XP drilling rig is completed and commenced working.
2000ton capacity Pile Load Test
2000ton capacity pile load test was completed in success.
Seimic Test with CPT
We have initiated seismic measurements with CPT. We have added shear and pressure wave velocity measurement capability to continious data collection feature of CPT.
T. C. Karayollari
OHL Tuzla Infantry School Bridge
Φ 120 piles
01/04/2013
Ceylan İnsaat
Bolu Project
Φ 80 jet grout
01/04/2013
T. C. Karayolları
Erzincan Erzurum Highway
Manufacturing Φ120 piles for cut-and-cover tunnel in Mutu Bridge Erzincan Erzurum Highway
01/04/2013
University Project
Yalova Cınarcık Highway
manufacturing Φ100 pile for University entry crossing in Yalova Cınarcık Highway
01/04/2013
Canakkale-Bandırma Road Landslide Improving
Canakkale-Bandırma Road Landslide Improving
Φ 120 cm bored pile
20/11/2012
Begum Yapi Bursa
Toki Housing Development Adminstration Of Turkey School Construction in Yalova
Φ 80 cm bored pile
5/12/2012
Salini-Kolin-GCF Partnership
Ankara-Istanbul High-Speed Train Kocaeli
Soil improvement with Φ 80 cm jetgrout 1 according to TCK and relevant conditious of contract in Gebze-Kosekoy part
10/2012
HASOGLU YAPI
Newista
Subase Piles
08/2011
GAMA-NUROL
Marmaray Project Injection
Marmaray Project Uskudar-Yenikapi-Ayrilikcesme stations injection
10/2010
ZTM Main Office
Kardeskent 1 Sitesi A-1 Blok Daire 2
Beylikduzu – Istanbul / Turkey
T : +90 212 886 51 51 F : +90 212 886 77 18
ZTM - Altunizade Office
Kusbakisi Cad. Asuroglu Sitesi 3. Blok/5-6
Uskudar – Istanbul / Turkey
T : +90 216 474 88 87 F : +90 216 474 88 86
ZTM - Kazakhstan Office
Republic of Kazakhstan Almaty
Panfilova 103/A
T : +7 727 271 85 33 


Soil Technologies Center - Services