IN-SITU TESTS AND GEOTECHNICAL INSTRUMENTATION
Diğer Faaliyet Alanları
Plate Loading Test

Plate loading test is based on measuring the force with a plaque that is applied force. The test is applied to shallow depths also in a shaft or boring base.

A small diameter plaque (approximately diameter is 8 cm) is overlapped by the force. Amount of the settlement is measured on the floor by the help of dial gouge and their averages are obtained.

In this test, heavy truck is lifted with a piston to a certain extent, the truck cannot be lifted and it becomes to make pressure to the floor. The test period is 10 minutes. Although shortened plate loading test’s period is maximum 2-3 minutes and same results are acquired in both. Ultimate bearing capacity of soil, deformation modulus and coefficient of soil is aimed at calculating are obtained.


Training (26 January 2013)
For the employee training, organized a seminar about "Write and Puplish a Scientific Paper" on 26 January 2013.
Training (19 January 2013)
For the employee training, organized a seminar about "How to use Plaxis and Plaxis examples" on 19 January 2013.
Bauer BG 24 H bored pile machine is added to our machinery park.
Bauer BG 24 H bored pile machine is added to our machinery park (2011).
2 Soilmec PSM-8G boring machines are added to our machinery park.
Soilmec PSM-8G boring machines have the feature of crawlers, automatic SPT and drilling from every angle.
Marmaray Project
We are working at Yenikapı and Üsküdar sites of Marmaray Project.
We have joined to the International Geosynthetics Society, IGS.
Our company which is active at Geosynthetics area, joined to the International Geosynthetics Society, IGS.
Casagrande B200 XP drilling rig is added to our machinery park.
Custom transactions of the Italian Casagrande B200 XP drilling rig is completed and commenced working.
2000ton capacity Pile Load Test
2000ton capacity pile load test was completed in success.
Seimic Test with CPT
We have initiated seismic measurements with CPT. We have added shear and pressure wave velocity measurement capability to continious data collection feature of CPT.
T. C. Karayollari
OHL Tuzla Infantry School Bridge
Φ 120 piles
01/04/2013
Ceylan İnsaat
Bolu Project
Φ 80 jet grout
01/04/2013
T. C. Karayolları
Erzincan Erzurum Highway
Manufacturing Φ120 piles for cut-and-cover tunnel in Mutu Bridge Erzincan Erzurum Highway
01/04/2013
University Project
Yalova Cınarcık Highway
manufacturing Φ100 pile for University entry crossing in Yalova Cınarcık Highway
01/04/2013
Canakkale-Bandırma Road Landslide Improving
Canakkale-Bandırma Road Landslide Improving
Φ 120 cm bored pile
20/11/2012
Begum Yapi Bursa
Toki Housing Development Adminstration Of Turkey School Construction in Yalova
Φ 80 cm bored pile
5/12/2012
Salini-Kolin-GCF Partnership
Ankara-Istanbul High-Speed Train Kocaeli
Soil improvement with Φ 80 cm jetgrout 1 according to TCK and relevant conditious of contract in Gebze-Kosekoy part
10/2012
HASOGLU YAPI
Newista
Subase Piles
08/2011
GAMA-NUROL
Marmaray Project Injection
Marmaray Project Uskudar-Yenikapi-Ayrilikcesme stations injection
10/2010
ZTM Main Office
Kardeskent 1 Sitesi A-1 Blok Daire 2
Beylikduzu – Istanbul / Turkey
T : +90 212 886 51 51 F : +90 212 886 77 18
ZTM - Altunizade Office
Kusbakisi Cad. Asuroglu Sitesi 3. Blok/5-6
Uskudar – Istanbul / Turkey
T : +90 216 474 88 87 F : +90 216 474 88 86
ZTM - Kazakhstan Office
Republic of Kazakhstan Almaty
Panfilova 103/A
T : +7 727 271 85 33 


Soil Technologies Center - Services